Sunday, 20 April 2014

Industrial Lubricants, Greases and Gear Oil Plant




The modular plant is capable of producing a mixed quantity of Industrial Lubricants, Greases and Gear Oil with a capacity of 15,000 gallons per day. The Plant will manufacture various grades of Lubricant Oils produced by blending quantities of Naphthenic base oils with various additives and packed in 55-gallon drums, 5-gallon pails and smaller containers.
The plant could also produce various blends of higher concentration of Lubricants, Greases and Gear Oil products. The products will be designed to have long lasting friction free coating to penetrate, protect and lubricate moving and stationary metal surfaces. Estimated Cost - CIF, Installation, Training and Start-up: From 
$4.25 million.


FOR info send us an email:

info@ladenergy.com
infoladenergy@gmail.com

Liquefied Petroleum Gas (LPG) Filling Plant:




The #LPG Filling Plant will commercially bottle Liquefied Petroleum Gas sourced from Processing Unit of a Gas Gathering Plant or a local Crude Oil Refinery, which will be bottled for domestic consumers. The LPG Filling Plant will have capacity to bottle a mix of 600-1,500 12.5kg, 15kg & 45kg cylinders per hour.

The Plant will come complete with 12-18 Heads Gas Filling Carousel, Piping System, Sprinkler System, Standby Power Generator, Chain Conveyor, Loading and Unloading Compressor Systems, 3 x LPG Tank Lorry Trucks and Gas Storage Tank, Pre-Engineered Factory Building, etc. Estimated Cost: CIF, Installation, Training & Start-up - $4.07 million.

FOR info send us an email:

info@ladenergy.com
infoladenergy@gmail.com

Saturday, 19 April 2014

Modular 6,000 or 12,000 BPD Crude Oil Refinery Plant


Modular Crude Oil Refinery with capacity of 6,000 BPD, complete with 3,000 BPD Catalytic Reformer/Hydrotreater can be designed to produce Unleaded Gasoline, Diesel, Kerosene/Aviation Fuel and Fuel Oil. The Plant can also be expanded to 12,000BPD, complete with Stabilizer Tower.
The Modular Refinery can be configured to process Crude Oils with API Gravity of 20°- 42.8°, with typical products yield as follows:
Off-gasIBD to 60deg.F yield wt.%: 1.7% (102 BPD)
Unleaded Gasoline60 to 350deg.F yield wt.%: 22.7% (1362 BPD)
Kerosene (Jet)350 to 455deg.F. yield wt.%: 15.9% (954 BPD)
Diesel455 to 650deg.F. yield wt.%: 25.5% (1530 BPD)
Residual Fuel+650deg.F. yield wt.%: 34.2% (2052 BPD)


Equipment List of a 6,000 and 12,000BPD Modular Refinery Plants & Machinery include:
A. Plants & Machinery:





  • 6,000BPD Crude Topping Unit (Distillation System)
  • Boiler System and Cooling Tower System and Stabilizer Tower
  • Blower System and Desalter System, 1 MW Power Generator System
  • Flare System and Air Compressor System, 3,000 BPD Catalytic     Reformer/Hydrotreater
  • Pre-Engineered Steel Buildings – Administrative, Project & Auxiliary 
  • Internal Piping Systems and 120,000bbl Tank farm with Piping and Loading     Systems
  • Pipeline & Accessories, capable of constructing up to 10 km 6 inch dual Pipelines     connecting the Refinery Tank Farm with Crude Oil Source (1 Pipeline to carry Crude     Oil Feedstock and the other Refined Petroleum Products)
  • Water Treatment Systems & Lightning Protection Equipment
  • Ocean Freight and Transit Insurance, P&M Installation Costs and Spare Parts, etc.


  • B
    Local In-country Project Site Construction Components:

  • Site Survey & Clearing, Environmental Impact Assessment (EIA), Soil Boring,     Topographical Survey, Borehole Construction, Water Analysis, Topsoil Stripping     and Stockpiling (available size of land 15-20 Hectares)
  • Fencing, Erection of Site Office and General Site Engineering Design Construction
  • Right of Way (ROW) Survey of Pipeline Route to connect the Refinery’s Tank Farm     to Crude Oil Terminal Source of up to10 km away
  • Construction of Pre-Engineered Project Buildings Foundations and Foundations for     Equipment, Plants and Machinery
  • Layout and Construction of Tank Farm Foundations
  • Installation of Pre-Engineered Project Buildings
  • Local Engineering Costs

  • Total Project Cost – 6,000BPD, 120,000 bbl Tank Farm and 3,000BPD Catalytic Reformer/Hydrotreater, including cost of Installation, Training, and Start-up
    $69.61 million.
    To raise the capacity to 12,000BPD with the additions of 6,000BPD Distillation Unit, 120,000 Barrels Tank Farm and 3MW Power Generators, the combined cost is estimated at $159.7 million.



  • Thursday, 17 April 2014

    14/12 Cutter Suction Dredger




    #14/12 #DREDGER #CUTTER #SUCTION AVAILABLE FOR #SALE #Dredging #Equipment for more details click on the following link or send an email to info@ladenergy.com or infoladenergyequipment@gmail.com
    www.ladenergy.com